Categories: Oil & Gas

  • November 5, 2024
    The overall project involved the design and construction of seven separate crossings, totaling to 5.9 kilometres of 14-inch steel pipe…
  • July 30, 2024
    APA's Western Outer Ring Main (WORM) involved the construction of 51 kilometres of high pressure transmission gas pipeline installed from…
  • June 19, 2024
    Good design and responsible delivery assured success on the recently completed SGW Jemena East HDD project, delivered as part of…
  • June 19, 2024
    Jemena's Port Kembla Lateral pipeline involved the construction of a 12 kilometre DN450 buried gas transmission pipeline to connect the…
  • December 4, 2022
    UEA successfully completed four HDD installations on a major project in South Perth, Western Australia. All of the bores had…
  • September 12, 2021
    The shifting sands of Perth can add complexity to trenchless projects. However, with good drilling practices and a swift, well…
  • May 12, 2018
    As a part of the refurbishment of Port Kembla copper fabrication facility, the existing gas main needed to be relocated…
  • August 25, 2017
    UEA successfully completed the HDD scope required as part of the Rouse Hill stage 3 secondary gas main extension project.…
  • May 30, 2017
    The redevelopment of the IMAX Sydney site, known as the Ribbon Development Project, formed part of the renewal of the…
  • August 5, 2015
    BP Australia owns and operates a fuel terminal located at the corner of Industrial Drive and Elizabeth Street in Carrington,…