As several towns in the south coast region of New South Wales were receiving potable water supplied through a single-source line experiencing sustainability issues, an alternative supply was required. UEA was initially engaged by a major water authority for early contractor involvement via assistance in asset location, expert know-how on HDD installation and general water main construction design advice.
The installation of the 800 metres of potable was installed using separate techniques:
The initial temporary bypass design required an extension of approximately 170 metres, which eliminated the need for a major shutdown to these towns. The risk mitigation of this extension, recommended by UEA, was favourably looked upon by both the client and also by the local community.
Despite some horrendous weather conditions and subsequent flooding, the project was delivered ahead of time, under budget and to the satisfaction of our client. UEA’s early involvement with the client ensured the project went to plan from day one.